The Adam Beck stations as seen from the air, the northern dam (nearest) is Adam Beck I and the southern is Adam Beck II.
'Sir Adam Beck Hydroelectric Power Stations' are two hydro electric power stations in
Niagara Falls, Ontario,
Canada. The stations divert water from the Niagara River above the falls which flows back into the lower portion of the river.
Adam Beck I contains 10 generators and first produced power in 1922. It was originally called the Queenston Chippawa power station and was renamed after
Adam Beck in
1950 on the twenty fifth anniversary of his death. The water is diverted through a canal from the
Welland River.
Adam Beck II contains 16 generators and first produced power in 1954. The water is diverted from the
Niagara River above the falls through underground pipes. A reservoir was created that permits the holding of water, diverted during the night, for use during the day. Adam Beck II is currently undergoing major modification in the form of the
Niagara Tunnel Project in order to improve its generation output. This new tunnel is expected to be in operation by late 2009.
External Links
★
Images of Sir Adam Beck 1 Niagara Falls Public Library (Ont.)
★
Images of Sir Adam Beck 2 Niagara Falls Public Library (Ont.)
★
Images of the Queenston-Chippawa Power Canal Niagara Falls Public Library (Ont.)
See also
★
Robert Moses Hydro-Electric Dam