'Interstate 287' (abbreviated 'I-287') is a major interstate highway in New Jersey and New York. It is a partial beltway around New York City, serving the northern half of New Jersey as well as the counties of Rockland and Westchester in New York. I-287 follows a roughly horseshoe-shaped route. The route through New Jersey is sometimes referred to as the ''Middlesex Freeway''.
Similar to what still exists today with the New Jersey portion of Interstate 95, Interstate 287 was long disjointed due to community opposition. The New York stretch effectively ended at Suffern, and the New Jersey portion at U.S. Route 202 in Montville, with a large gap between. Finally, by the late 1980s, construction commenced, with this missing section opening in November, 1993.

Contents
Major cities
Route description
New York
New Jersey
Exit list
New Jersey
New York
Length
Spur routes
Notes
Past plans
Missing link
Tappan Zee Improvement
References
Sources
External links

Major cities


Bolded cities are officially-designated control cities for signs.

★ 'Staten Island, New York' (via I-278

★ 'Perth Amboy, New Jersey' (via Route 440)

★ 'Somerville, New Jersey'

★ 'Morristown, New Jersey'

Boonton, New Jersey

★ 'Mahwah, New Jersey'

★ 'Suffern, New York'

★ 'Tappan Zee Bridge, New York'

★ 'White Plains, New York'

★ 'Rye, New York'

Route description


Although Interstate 287 is an auxiliary route of Interstate 87, both of its termini are located at Interstate 95. It is the only three-digit interstate which goes through more states than its parent route — I-87 is an ''intrastate'' interstate.
New York

Working counter-clockwise, I-287 begins in Port Chester, New York at the New England Thruway (Interstate 95) with an East/West designation until the New Jersey State Line. It is also called the Cross-Westchester Expressway until the New York State Thruway merge. Once merged with the northbound Thruway (and northbound Interstate 87), it crosses the Tappan Zee Bridge over the Hudson River between Tarrytown and Nyack, and continues west to Suffern. It then leaves the Thruway (and Interstate 87) and crosses the New Jersey border.
'Legal Definition'
The New York section of I-287 is defined as Interstate Route Connections 520 and 525 in New York Highway Law § 340-a.
New Jersey

Beginning at the New York-New Jersey state line in Mahwah Township, it receives a North/South designation like its parent Interstate 87 and begins its run south, cutting through hills and mountains. Between Mahwah Township and the Boro of Oakland/Boro of Franklin Lakes, the freeway has 2 lanes in each direction. South of Exit 59, the freeway has 3 lanes in each direction, and goes through a steep valley (over a bridge). Due to the high elevations, the freeway (at some points) has an extra 4th lane to accommodate for slower automobile traffic.

The freeway then intersects Interstate 80 (''Bergen-Passaic Expressway'') in Parsippany-Troy Hills Township, and then accommodates up to at least 5 lanes in each direction. It continues further south, through Morristown (where the lanes are 3-4 in each direction) and eventually to Bedminster Township, where it intersects Interstate 78. At this point, I-287 then splits into an interesting dualized roadway configuration. The roadway splits for about 2-3 miles, continuing into Bridgewater Township. At the interchange for US 202-206, both roadways have exit ramps towards 202/206, and then it become a 4-lane freeway. The highway then curves southeast, heading towards Perth Amboy. Once I-287 crosses the Raritan River between Exits 10 and 9 (heading south) it becomes the Middlesex Freeway. However, the I-287 signage ends at the interchange for the New Jersey Turnpike (Interstate 95) in Edison Township, New Jersey; however, the roadway continues as Route 440 towards Staten Island.
One of the most heavily traveled sections of the freeway is between South Plainfield and Edison. This segment has not been repaved in years, and is in need of dire repair (since about 150,000 vehicles use this segment everyday). The NJDOT is addressing this problem, and has started the ''Interstate 287 (Middlesex Freeway) Rehabilitation Project'', in which the DOT will resurface the terrible pavement between between Exit 5 in the Boro of South Plainfield and (Exit 0) Interstate 95/New Jersey Turnpike in Edison Township. In addition, the NJDOT stated that some of the bridges/overpasses have deteriorated to such a state that they need to be replaced completely. The project started in August 2007 and is supposed to end in November 2008.

Exit list


New Jersey

CountyMunicipality#MileDestinationsNotes
Southern terminus of
Interstate 287
Interstate 287 southbound becomes
Route 440 northbound
MiddlesexEdison Township0.00
I-95 New Jersey TurnpikeTrenton, Philadelphia, Newark, New York City
1A-B0.93
US 1/CR 531Trenton, Newark
2A-B2.24
NJ 27, Lincoln HighwayMetuchen, New Brunswick
Northbound exit, southbound entrance
33.09
CR 501, New Durham Road – Edison, Metuchen
Southbound exit, northbound entrance
South Plainfield Boro44.62Durham Avenue – South PlainfieldNorthbound exit, southbound entrance
South Plainfield Boro/Piscataway Township55.88
CR 529, Stelton Road – Dunellen, Edison
Piscataway Township66.41Washington Avenue – Piscataway, DunellenNorthbound exit and entrance, southbound exit only
77.27South Randolphville Road – Piscataway, Middlesex
88.47Possumtown Road – Middlesex, Highland ParkNorthbound exit and entrance
88.47Centennial Avenue - Middlesex, Highland ParkSouthbound exit and entrance
99.95
CR 622, River Road – Middlesex, New Brunswick
SomersetFranklin Township1010.27
CR 527, Easton Avenue – New Brunswick, Somerset, South Bound Brook
1212.30Weston Canal Road
Bridgewater Township1313.50
NJ 28, Union Avenue – Somerville, Middlesex
Split into 13A/B northbound
14A14.24
US 22 east – New York City
14B14.35

US 22 west to US 202/US 206 south – Bridgewater
Northbound exit and entrance, southbound entrance only
1717.86

US 202/US 206 south to US 22 west – Somerville, Flemington
Southbound exit, northbound entrance
Bedminster Township21A-B21.17
Interstate 78Easton, PA, New York City
22A-B22.21
US 202/US 206Pluckemin, Bedminster, Netcong
Bernards Township26A-B26.48
CR 525, Mt. Airy Road – Basking Ridge, Liberty Corner, Bernardsville
30A29.94North Maple Avenue – Basking Ridge
30B
US 202
MorrisMorris Township3334.02Harter Road – Jockey Hollow
Town of Morristown3535.77
35.89
NJ 124, South Street, Madison Avenue – Morristown
3636.39
36.60
CR 510, Morris Avenue, Lafayette Avenue – Morristown
Split into 36A/B northbound
Hanover Township3737.92
38.00
NJ 24 east – Springfield
3939.55
NJ 10Dover, Whippany
Parsippany-Troy Hills Township4040.94
CR 511Parsippany
4142.02
Interstate 80Delaware Water Gap, New York City
4242.74
US 46, US 202Dover
4344.06Intervale Road – Mountain Lakes
Town of Boonton4444.95Main Street – Boonton
4545.68Woonton Street – Boonton
Montville Township4747.11
US 202, Main Road – Montville, Lincoln Park
Boro of Riverdale5253.14
NJ 23Butler, Wayne
5353.83

CR 511 ALT, Paterson-Hamburg Turnpike
PassaicBoro of Wanaque5555.31

CR 511, CR 511 ALT, Ringwood Avenue
BergenBoro of Oakland5758.13Skyline Drive, West Oakland Avenue
5858.86
US 202, Ramapo Valley Road – Oakland
Boro of Oakland/Boro of Franklin Lakes5959.94
NJ 208 south – Franklin Lakes
Mahwah Township6666.94
NJ 17 south – Mahwah
I-287/NJ 17 concurrency begins northbound, ends southbound
Interstate 287 and
Route 17 continue north into New York.
Route 17 becomes
New York State Route 17.

New York

CountyLocationMile[1]#DestinationsNotes
RocklandSuffern0.00New Jersey state line.
Southern terminus of
NY 17. Northern terminus of
NJ 17.
NY 17 forms a 0.65 mile concurrency with I-287.
0.65
I-87/Thruway north/
NY 17 north
Western terminus of
I-87/Thruway/
I-287 concurrency.
Montebello3.4714B
Airmont Road - Suffern, Montebello
Spring Valley6.78Spring Valley toll barrier (commercial vehicles only). Westbound only.
7.5614AGarden State Parkway Connector - New JerseyNo trucks across the state line.
Clarkstown8.2914
NY 59 - Spring Valley, Nanuet
10.1513Palisades Interstate Parkway - George Washington Bridge, Bear Mountain BridgeNo trucks.
12.3312
NY 303 - Congers, West Nyack
Nyack13.4911
US 9W/
NY 59 - Nyack, West Nyack
South Nyack14.3410
US 9W - Nyack, South Nyack
Southbound: no exit.
Rockland-Westchester county line16.42Tappan Zee Bridge over the Hudson River. $4.00 toll eastbound.
WestchesterTarrytown18.249
US 9 - Tarrytown
Originally planned to include Interstate 487.
GreenburghEastern terminus of
I-87/Thruway/
I-287 concurrency.
Eastbound traffic defaults onto The Cross-Westchester Expressway

Length



New Jersey: 67.54 miles (108.7 km)

New York: 31.11 miles (50.06 km)


★ Overlap with Route 17: 0.65 miles


★ New York State Thruway mainline: 19.13 miles


★ Cross Westchester Expressway: 11.33 miles

Spur routes


Notes


I-287 is known, even after rush hour, to have congestion problems (in New Jersey), namely the portion that traverses through Bedminster and Bridgewater. In due time, the freeway is expected to see some improvements in the Bridgewater area. The exit for US 202-206 is expected to be upgraded in the future.
The entire New York section is operated by the New York State Thruway Authority, although only the section shared with I-87 is part of the mainline Thruway. The rest of the NY section is called the Cross-Westchester Expressway. No tolls exist on this portion, and signs mentioning the Thruway Authority are rare along its length. This arrangement was similar to that of Interstate 84 in New York, prior to October 30, 2006.
I-287 interchange with I-87 in Suffern, New York. The New Jersey state line is about halfway up the photo.

In New York, Thruway exits 8 and 8A and Cross-Westchester Expressway exit 1 are now combined in one interchange. Formerly, there were two separate interchanges: Thruway interchange 8, to the Cross-Westchester, and Cross-Westchester exit 1 (Saw Mill River Parkway to/from north only (use Thruway interchange 7A for to/from south), with access only to/from west (use interchange 3 for access to/from the east)). Due to the recent rebuilding of interchange 8, all traffic from I-287 east must remain on the Thruway beyond point where I-287 leaves it and exit at 8A, which leads to what appears to be a service road for the CWX, but ends up leading to the Saw Mill. However, to reach I-287 west from the Saw Mill south, one must merge with I-287 before merging with the Thruway (no 8A).
In New Jersey, 287 is an important interstate that links Mahwah Township, New Jersey to the New Jersey Turnpike in Edison Township. Plus the freeway is one of the most heavily traveled freeways to be utilized by tractor-trailers (in the state of New Jersey), as it connects Interstate 87/New York State Thruway in Suffern, New York to Interstate 95/New Jersey Turnpike in Edison Township, New Jersey. This is all due in part to the tractor-trailer restrictions on the Garden State Parkway.

Past plans


I-287 was to continue past I-95 in Port Chester and was to cross Long Island Sound via the (unbuilt) Oyster Bay-Rye Bridge and absorb the Seaford Oyster Bay Expressway (NY 135). Then, I-287 was again to be extended into Jones Beach by merging with the Wantagh State Parkway in Merrick. These plans were dropped as a result of community opposition and environmental concerns. Evidence of this exists at the northern end of NY 135 at exit 14 (NY 25) where there is an incomplete cloverleaf interchange and the southern end at exit 1 where there is a non-conventional interchange with Merrick Road.[2]

Missing link


I-287's uncompleted section between Mahwah and Montville was the source of a great deal of controversy dating back at least to 1965, and continuing on through its opening in 1993. Property owners along the proposed route fought its completion as part of the freeway revolts of the 1960s and 1970s. Eventually, a route was agreed upon and permits allowing construction to begin were issued in 1988. However, officials in Rockland County, New York, filed a lawsuit on November 19, 1993, hours before the highway's official ribbon-cutting, seeking to block its opening, claiming the incompete interchange with the New York State Thruway was inadequate to handle the additional traffic. That interchange was not completed until late the following year, but the highway nevertheless opened as planned.
It was widely speculated in New Jersey at the time that then-Governor James Florio sought the highway's premature unveiling to bolster his ultimately unsuccessful re-election campaign. Ultimately, however, the opening did not occur until over two weeks following the gubernatorial election, negating any impact it may have had.

Tappan Zee Improvement


Due to the congestion along I-287 and the aging and decay of the over fifty-year old Tappan Zee Bridge, talks have begun regarding the possibility of replacing the bridge. A variety of transportation improvements are currently being considered, including a commuter rail system that would link the western shore of the Hudson River with Westchester County and New York City. Several alternatives are being considered to replace the bridge.[3] Currently, the favored alternative is a cable-stayed span.

References


1. New York Routes - Interstate 287 Junction List
2. Oyster-Bay Rye Bridge, accessed July 30, 2006
3. I-287 Proposed Alternatives, accessed July 12, 2006

Sources



★ 2005 Rand McNally Road Atlas

★ "Missing Link of Interstate Opens, Despite Lawsuit." ''The New York Times,'' November 20, 1993. Metropolitan Desk, p. 26.

External links



Interstate 287 in New Jersey Straight Line Diagram from the New Jersey Department of Transportation

Highway Heaven

This article provided by Wikipedia. To edit the contents of this article, click here for original source.

psst.. try this: add to faves